Start Your OEM Project

Discuss Your Rubber Sole Project

Whether you have a drawing, physical sample, reference photo, existing mold or an initial sole concept, Matrix Route is ready to discuss your project.

Component Manufacturing ScopeWe manufacture rubber soles, natural-rubber insoles and related molded rubber components—not complete finished footwear.
In-House Mixing
Kneader & Mill
Shore A 35–75
Hardness Tuning
1,500 Pairs
Typical MOQ Entry
Up to 50,000
Pairs / Month
Thailand
Direct Factory
No Friction Entry

You Can Contact Us Even If You Only Have:

"You can begin with an initial sole concept. Complete technical documentation is not required—we can review the project from a rubber formulation and manufacturing perspective."

An initial sole concept
A reference photo
A physical sample
An existing mold
A production problem
Or simply a question

Project Inquiry & RFQ Form

Complete required fields below. Initial technical discussion and project review are provided as part of the OEM inquiry process.

0 / 5000 chars

Optional — PDF, JPG, PNG, DXF, DWG, ZIP (Combined max 20 MB).

No obligation. Initial technical discussion and project review are included.

Transparent Workflow

What Happens Next

From inquiry receipt to technical review and sample trial press.

01

Initial Review

Our team reviews your company details, product interest and initial project specifications before confirming next steps.

02

Technical Discussion

Where needed, our technical team discusses material, mold, hardness, production and performance requirements with you.

03

Formal Quotation

A formal quotation is prepared after technical requirements, mold parameters and compound specifications are reviewed.

Development Note: New mold development and technical-review timelines depend on project complexity, 3D CAD drawing availability, and physical sample testing requirements.

Commercial Reference Standards

Production Order MOQ:

Typical production MOQ starts from 1,500 pairs per style and color, with a minimum quantity of approximately 300 pairs per size, subject to compound, tooling and project requirements.

Trial Production MOQ:

Initial trial batches typically start from 1,500 pairs per style/color run (~300 pairs per size), subject to tooling and project specifications.

Production Capacity:

Up to 50,000 pairs per month from our Samut Prakan, Thailand facility.

Durometer Hardness Range:

Tunable within our verified formulation range from Shore A 35 (cushioning) to Shore A 75 (durable outsole wear).

New Mold Tooling:

Custom mold tooling cost is paid in advance prior to tooling preparation.

Formal Quotation Timeline:

Prepared after technical requirements, mold parameters and compound specifications are reviewed.

Direct Assistance

Not Sure Whether Your Project Fits Our Capability?

Send us a short message. Our team will tell you honestly whether Matrix Route can support the project.